Asian Paints TruCare Wall Putty - 40kg
Smooth Finish for Beautiful Walls
₹1120.00₹820.00
Asian Paints TruCare Wall Putty
Product Overview
Achieve flawless, super smooth, and beautiful walls with Asian Paints TruCare Wall Putty. This premium, white cement-based putty is specially formulated to level surface imperfections on cement plasters. Ideal for both interior and exterior walls, it creates a robust, uniform base that enhances the adhesion and final finish of your premium topcoats while preventing premature peeling.
Key Features
Super Smooth Finish: Effectively fills micro-pores and imperfections on cement plasters to create a highly refined finish.
Water Resistant: Provides enhanced resistance against moisture, ensuring protection from dampness.
Strong Adhesion to Plaster: Formulated to bind powerfully with cement surfaces for lasting durability.
Anti-Peel Formula: Enhances paint film anchorage, ensuring your topcoats stay flawless without peeling or blistering.
Eco-Conscious & Safe: Contains no added Mercury, Arsenic, or Chromium. Total lead content is strictly controlled and guaranteed not to exceed 90 parts per million.
Product Specifications
Property | Details |
Brand | Asian Paints |
Product Line | TruCare |
Product Type | White Cement-Based Wall Putty |
Application Suitability | Interior & Exterior Walls |
Base Material Compatibility | Cement Plasters |
Environmental Safety | Lead content does not exceed 90 ppm |
Application Instructions
1. Surface Preparation
Remove all loose adhering material from the plaster using a wire brush.
Pre-wet the wall surface with water prior to application. For walls directly exposed to the sun, ensure sufficient water spraying to dissipate heat away from the surface.
2. Mixing & Paste Preparation
Mix TruCare Wall Putty with 40%–50% water by weight to form a smooth, homogeneous paste.
Allow the prepared paste to mature (slake) for 10–15 minutes.
Mix the paste again briefly for 2–3 minutes before application.
3. Putty Application
Apply the first coat of the mixture smoothly using a putty knife or trowel.
Allow the first coat to dry completely for a minimum of 4 hours.
Pre-wet the surface lightly again, then apply the second coat.
Note: If the mixed putty paste is left undisturbed for more than 30 minutes, remix it well before applying.
4. Priming & Topcoat
For an exceptionally smooth texture, use fine emery paper to sand the dry surface.
Always apply a high-quality primer (such as AP TruCare Primer) directly over the finished putty layer to secure a strong paint film bond before applying 2 to 3 coats of your chosen topcoat.
Contact information
+91 8792788521
© 2026. P.S has All rights reserved.
+91 9519570295
sussaienterprises@gmail.com
Email:
Address:
2M, RN PLAZA, 453, 2nd Main Rd, Lal Bahadur Nagar, East of NGEF Layout, Kasturi Nagar, Bengaluru, Karnataka 560043
Phone no:
Connect with us
